03
2023
-
01
What are the procedures for restaurant decoration engineering
Author:
Material budget and cost allocation: Currently, people prioritize comfort, and the reasonable proportion of material costs is: 45% for bathrooms and cabinets, 35% for halls, and 20% for bedrooms.
Material budget and cost allocation: Currently, people prioritize comfort, and the reasonable proportion of material costs is: 45% for bathrooms and cabinets, 35% for halls, and 20% for bedrooms.
1. Wall paint (package material Dulux Gold 5-in-1) 16/square meter
2. Gypsum board ceiling (Dragon brand) 95/square meter
3. Aluminum buckle plate (Jack light steel keel) 90/square meter
4. Gypsum internal corner line (Guangzhou Jianjun) 8/m
5. TV background wall 880
6. Door (Junjian special grade large core board, sprayed with Weibai paint) 600/piece
7. Door cover (Junjian special grade large core board, sprayed with Weibai paint) 60/m
8. Window cover (Junjian special grade large core board, sprayed with Weibai paint) 80/m
9. Plastic steel door (Fengying) 400/piece
10. Window sill artificial stone surface (2 meters * 0.7 meters) 700/piece
11. Sliding door (Junjian special grade large core board, sprayed with Weibai paint) 600/piece
12. Wardrobe (1.8m * 2.6m imported melamine board) 2000/piece
14. Cabinet (4.5m imported melamine board artificial stone countertop) 3000
15. Sliding window (2 meters * 2.2 meters Junjian special grade large core board, sprayed with Weibai paint) 1000/piece
16. Masonry (floor tiles: 800 * 800, 48 square meters, 10/square meters)
600 * 600 15 square meters 6/square meter
Cabinet and bathroom wall tiles: 55 square meters 9/square meters
Floor tiles: 20 square meters 6/square meter
Ground leveling 42 square meters 4/square meter
6 door stones 10/piece
3 tons of cement and 5 cubic meters of sand
Total: 3300 yuan
17. Water and electricity renovation: 800 (excluding materials)
Previous page
Knowledge of glass installation construction
Before installing the glass, the dirt inside the groove should be removed thoroughly, and a 1~3mm thick bottom ash should be evenly applied along the entire length of the groove, and the flat glass should be pushed until oil spills.
2023-01-03
Installation process standards for switches and sockets
All types of switches: The specifications and models must meet the design requirements and have a product qualification certificate. All types of sockets, specifications and models must meet the design requirements and have a product qualification certificate.
2023-01-03